Plant overview and key metrics
Compliance
Lab results score
Current Flow
Active Alerts
Work Orders
Aeration Basin pH
7.4pH
Disinfection Chlorine
1.1mg/L
Influent Flow
11.0MGD
Effluent Turbidity
1.5NTU
Effluent Turbidity Trending Up
Effluent turbidity is approaching normal upper limit.
Check filter backwash schedule and inspect media depth.
Influent Flow Pattern Shift
Flow profile changed from expected morning ramp by 8%.
Correlate with upstream pump station runtime logs.
Low Chlorine Residual Detected
Disinfection residual dropped below target for 6 minutes.
Verify dosing pump output and inspect chlorine supply line for blockage.
Aeration Basin pH Drift
pH sensor in Basin 2 shows recurring drift near lower bound.
Schedule probe cleaning and calibration at end of shift.
Pending Lab Result Near Permit Limit
Latest phosphorus sample is pending review and near reporting threshold.
Prioritize confirmation run and notify compliance lead if confirmed.